VSMC installed the last inter-array cable at Meerwind Süd|Ost; 88 inter-array cables and 176 pull-ins completed
VSMC completed installation of the inter-array cable system at the Meerwind Süd|Ost offshore wind farm, finishing the final pull-in in early July 2013. The company reported completing three cable load-outs, installing 88 inter-array cables and executing 176 pull-ins, with no recordable incidents.