Neutral
Informational - no clear directional impact
Low Impact
Minor progress or informational
Between 25 March and 23 April 2021, the Petroleum Safety Authority Norway (PSA) carried out an audit of Equinor focused on completion and preparation for operation of the Martin Linge A platform and Martin Linge B FSO. The audit, conducted ahead of granting consent to use Martin Linge, examined process safety, technical safety, safety-instrumented systems and electrical installations, and resulted in three regulatory non‑conformities and two improvement points, with Equinor required to report by 27 August 2021 how it would address them.