Scottish and Southern Electricity Networks (SSEN) was referenced by the project as a transmission network party the developer was working with alongside NGESO regarding the remaining grid connection capacity and the Holistic Network Design Follow Up Exercise, and as the host of the proposed Netherton Hub substation connection point west of Peterhead.