Geoquip Marine started a geotechnical investigation campaign for the MarramWind floating offshore wind farm to gather soil and geotechnical data for an engineering ground model. The investigation was described as supporting feasibility studies and informing design and installation assessments for floating platform anchors, fixed foundations for an offshore substation, and inter-array cable systems. The work was reported as being undertaken using Geoquip’s vessel Seehorn, with down-hole investigations planned to continue into 2024 using an Integrated Geotechnical Survey Vessel (IGSV).