Negative
Setback or risk materialised
Medium Impact
Significant progress or notable issue
In December 2019, the Malta–Sicily interconnector suffered a failure after the subsea cable was damaged by a ship’s anchor, causing power outages in Malta as the link to the Italian grid went out of service.