AG Installations was awarded a contract (reported in August 2024) to carry out installation works at the Malta Sicily Cable Link 2 (IC2) terminal substations, including installing two shunt reactors at Ragusa (Sicily) and Maghtab (Malta), and installing a transformer for the interconnector substations.