National Grid built and operated the 400 kV compound at Cleve Hill that provided the connection from the London Array onshore substation to the UK national transmission system, including the overhead line landing compound and associated switchgear and auxiliary services. The grid connection from the substation to the national transmission system was completed in September 2011.