Bilfinger Berger GmbH, in consortium with Per Aarsleff A/S, was contracted by the London Array consortium for Phase 1 execution works at the 630 MW London Array offshore wind farm in the Outer Thames Estuary. The contract scope covered the design, production and installation of 177 monopile foundations (including two for the offshore transformer stations) and the installation of 175 wind turbines.