Neutral
Informational - no clear directional impact
Low Impact
Minor progress or informational
A further bathymetric post-construction survey of the London Array export cable corridors (HV1–HV4) was carried out from 9 to 16 April 2014, re-surveying the cable routes, nearshore sections and crossing areas identified as focus points in earlier work to track seabed evolution and cable exposure around the operational OFTO export system.