As part of a Danish grid visual enhancement initiative, the project at Lillebælt (Little Belt) replaced two 400 kV overhead line systems crossing the strait between Funen and the Jutland peninsula with new cable infrastructure. A total of 2 × 12 km of overhead lines at the strait crossing and on land were removed and substituted by two 420 kV cable circuits of about 13 km each, comprising underground sections on both the Jutland side and near Middelfart on Funen, and a 7.5 km submarine section through the Little Belt strait, completing the installation of the interconnector’s cable system and enabling decommissioning of the former overhead lines.