Project advancing - milestone achieved
Medium Impact
Significant progress or notable issue
Siemens group entities were selected to deliver the Lincs offshore transmission substations, with Siemens Transmission and Distribution contracted for the onshore works and Siemens Project Ventures awarded the offshore and onshore substation design. These contracts covered the onshore substation, which steps voltage from 132 kV to 400 kV at Walpole, and the offshore substation platform equipped with 240 MVA transformers and 132 kV/33 kV switchgear, both of which form core elements of the Lincs OFTO transmission system.