Positive
Project advancing - milestone achieved
High Impact
Major milestone or critical setback
AST’s Annual Statement of Transmission System Operator (2024) describes the Latvia–Sweden interconnection (LaSGo link) and states that “The expected implementation time of the project is until 2040.” This is taken as the developer/TSO’s stated target timeframe for the interconnector to be implemented/commissioned, and therefore as the best available proxy for first energisation/first power on the LaSGo link by 2040.