On 22 July 2024, 50Hertz commissioned a consortium of Siemens Energy and Dragados Offshore under an EPCI contract to deliver the LanWin3 converter system, comprising an offshore converter platform built in southern Spain and an onshore converter near Schwerin, both to the 2 GW, 525 kV HVDC standard to transmit power from the N-11.1 offshore wind area to the Heide grid connection point and into the NordOstLink.
BNetzA confirmed LanWin3 in Netzentwicklungsplan (NEP) 2037/2045 (2023) on 1 March 2024. This confirmation under §12c EnWG creates the legal basis for the responsible TSO to plan, procure, and construct the offshore grid connection system.
BNetzA confirmed the Netzentwicklungsplan Strom 2037/2045 (2023 edition) on 1 March 2024 under section 12c of the German Energy Industry Act (EnWG). This confirmation creates the legal basis and obligation for the responsible TSO to plan, procure, and construct this offshore grid connection system. For regulated German TSO offshore grid connections, the BNetzA NEP confirmation functions as the de facto Final Investment Decision: unlike merchant or developer-led projects that require a separate board-level investment decision and financial close, the NEP confirmation simultaneously authorises and obligates the TSO to invest. Costs are recovered through the offshore grid levy (Offshore-Netzumlage). The NEP 2037/2045 (2023) schedules 25,980 MW of offshore transmission capacity across 16 grid connection systems for commissioning between 2026 and 2032.
Upgrade to access detailed cable specifications, supply chain data, projected timeline, financial analysis, and more.
LanWin3 is a 50Hertz‑led high‑capacity HVDC offshore grid connection designed to link a 2,000 MW offshore wind farm area (N‑11.1, ~120 km NW of Helgoland) to the German mainland. The system uses extruded 525 kV DC technology and comprises an offshore converter platform with HVDC converter equipme...
Owners
NOR-11-1
On 29 September 2023, 50Hertz awarded Prysmian PowerLink long-term EPCI contracts under Lot 2 of its HVDC cable tender for the NOR-11-1 offshore grid connection and the associated DC31 onshore link, covering design, manufacture, supply, installation, testing, and commissioning of approximately 1,000 km of ±525 kV HVDC submarine and underground cable systems to connect North Sea wind area N-11-1 to the German grid at Heide/West and onward to Klein Rogahn.