Dragados Offshore, as part of the Siemens Energy–Dragados Offshore consortium under a framework agreement awarded by TenneT, was responsible for the offshore converter platform for the 2 GW LanWin2 HVDC offshore grid connection in Germany. Dragados Offshore’s scope covered detailed design and engineering, procurement, fabrication and construction of the offshore platform (including load-out), as well as transportation, offshore installation, hook-up, and installation/commissioning of the platform systems. The LanWin2 offshore platform converts 66 kV AC collected from offshore wind farms to 525 kV HVDC for transmission to the onshore connection near Heide.