NKT signed an eight-year framework agreement with Danish TSO Energinet covering maintenance and repair of offshore and onshore power cable systems in Denmark, including assets associated with the Kriegers Flak Combined Grid Solution and the Kriegers Flak offshore wind farm. Within this operations and maintenance role, NKT provides repair preparedness, inspection and maintenance of spare parts, engineering support, and execution of on- and offshore cable repairs and jointing works for XLPE, mass impregnated and oil-filled power cables at 20–525 kV. The framework ensures rapid response in case of cable faults on key interconnector and grid-connection links such as Kriegers Flak, supporting long-term reliability of the hybrid interconnector between Denmark and Germany.