Positive
Project advancing - milestone achieved
Medium Impact
Significant progress or notable issue
Hitachi Energy was contracted to design, engineer, supply and install the full hybrid HVDC Light solution for the Kriegers Flak Combined Grid Solution, including the 410 MW/150 kV back-to-back converter station at Bentwisch in northern Germany and associated high-voltage equipment and digital master control systems. This HVDC system connects the Kriegers Flak offshore grid, part of the Danish electricity network, to the German grid, enabling controlled power flows and grid support between the two asynchronous systems.