HEDNO scheduled repair works on the medium‑voltage submarine cable of the Kos–Kalymnos interconnection to take place between Thursday 13 June 2024 and Sunday 23 June 2024, temporarily intervening on the existing AC link between the two Dodecanese islands to restore and maintain its condition.
In 2008, Asso.subsea commenced installation works for the 20 kV power interconnector between Kalymnos and Kos in Greece, performing cable laying, landings, and offshore protection over a route length of about 32 km with additional nearshore burial for project owner PPC and contractor Fulgor.
| South Aegean (Dodecanese) | Dodecanese (South Aegean) | |
|---|---|---|
| Landfall | ΑΣΠ Κω (Kos Autonomous Power Station) | ΑΣΠ Καλύμνου (Kalymnos Autonomous Power Station) |
| Grid Connection | ΑΣΠ Κω (Kos Autonomous Power Station) | ΑΣΠ Καλύμνου (Kalymnos autonomous power station / Kalymnos APS) |
South Aegean (Dodecanese)
Dodecanese (South Aegean)