JD Contractor A/S was awarded a works contract by Energinet Eltransmission A/S for KBH05 (cable systems HK13040 GLN–OCE and HK13041 AMV–GLN) covering the laying of approximately 12 km of 145 kV, 3-phase submarine cable, split into two sections of about 4 km and 8 km. The scope included installation in pre-excavated seabed trenches and in four landfall pipes in waters close to Copenhagen, with cable-lay water depths stated as approximately 1–18 m and a total cable weight of around 1,000 tonnes. Execution was scheduled for Q3 2025.