Concrete gravity-base foundations supporting 16 Vestas V112 turbines. Sources report foundation heights of ~15–25 m and differing per-unit weights in secondary sources (1,950 t quoted for the concrete units; 6,000 t quoted after ballast/stabilisation) — weight left null due to conflicting figures. Operated/commissioned by E.ON (now Aneo/RWE ownership history).
1 Cost inflated in local currency then converted to euros (where applicable).
Cable protection works for the Kårehamn export connection included nearshore trenching and protection of the two export cables in limestone and hard till, with installation of 690 four‑tonne gravelbag filter units (rockbags) in 5–25 m water depth; a supplier reference list records Karehamn as receiving cable protection using offshore rockbags in 2014.