Client for JD-Contractor A/S "Power Cable" project at location "Samsø-Jylland", corresponding to the 110 kV AC submarine interconnector between Jutland and Samsø.
NKT Cables appears in JD-Contractor A/S’s subsea cable-laying reference list as the client for a "Power Cable" project at the location "Samsø-Jylland". This indicates that NKT Cables held the prime contract for the Jutland–Samsø high-voltage AC submarine interconnector, supplying the submarine power cable system and managing its offshore installation via JD-Contractor. In this construction-phase role, NKT Cables was responsible for delivering the approximately 110 kV HVAC island link between the Danish mainland grid and Samsø, comprising two parallel submarine cables over an 18.5 km subsea route.