Siemens Wind Power supplied 27 × Siemens SWT-3.6-107 turbines (97.2 MW total) for the Inner Dowsing Offshore Wind Farm, with subsequent operations and maintenance scope under the project's O&M programme. Twin-site delivery alongside Lynn (54 turbines combined across both farms). Turbines were installed by MPI Offshore (vessel MV Resolution) by mid-2008; full operations from March 2009.