Final as-laid survey of the HVAC IFA2 nearshore cable route (vessel: Coastal Observer).
The vessel Coastal Observer conducted nearshore survey work for the IFA2 project, performing slow-line survey operations along the HVAC cable route in the Lee-on-Solent nearshore area as part of final as-laid verification between 4 August and 18 August 2020. The vessel operated with restricted manoeuvrability while collecting bathymetric and seabed data required for completion of the project's survey programme.