Positive
Project advancing - milestone achieved
Medium Impact
Significant progress or notable issue
Prysmian Group was awarded the turnkey contract to design, manufacture and install the HVDC submarine and onshore cable system for the IFA2 interconnector. The scope covered ~240 km of HVDC ±320 kV subsea and land cable between Tourbe (France) and Chilling/Chilling–Chilling/Chilling (UK) including the UK HVAC link connecting the converter station to the Chilling substation; manufacture was assigned to Prysmian factories in Pikkala (Finland) and Gron (France) and installation used Prysmian laying vessels Cable Enterprise and Ulisse. The award supported the project’s 1,000 MW technical specification and delivery schedule.