Landfall operations for IFA1 — the shore pull-ins and connections at the UK landing near Folkestone and the French landing near Calais — were completed as part of the overall installation and commissioning programme in 1986. The landside cable sections (the English and French onshore runs) were installed and tied into the respective converter station infrastructure prior to the interconnector entering service.