Hywind Scotland uses spar-buoy floating substructures with a three-point mooring (three suction anchors per turbine); mooring spread radius reported as 600–1,200 m in project documentation.
1 Cost inflated in local currency then converted to euros (where applicable).
100% ROC+ 1 PPA
In 2024, Equinor and Masdar executed a heavy maintenance campaign on all five turbines at the 30 MW Hywind Scotland floating wind farm. The Siemens Gamesa turbines were disconnected and towed to the Wergeland Base in Gulen, Norway, where major maintenance was performed in a controlled, sheltered environment before the units were returned offshore and reconnected at the site off Peterhead.