In 2008, planning applications were submitted for the Humber Gateway offshore wind farm together with the onshore underground cable, which forms the export cable route from landfall to the grid connection and is part of the transmission system later transferred into the Humber Gateway OFTO. These applications covered both the generation facilities and key transmission infrastructure required to connect the project to the onshore grid.