Array cable testing and termination; prepare/connect cables between turbines and offshore converter stations and test integration
JDR Cable Systems was awarded the array cable testing and termination contract for the Hornsea 3 offshore wind farm by Ørsted. JDR’s scope was to prepare and connect the inter-array cables between the wind turbines and the offshore converter stations, and to test the array cable system to confirm integration into the offshore electrical infrastructure and safe operation.