Tekmar Energy signed a contract with Ørsted to supply cable protection equipment for the Hornsea Two offshore wind farm. Tekmar was to manufacture and deliver 346 Cable Protection System (CPS) units (TekLink Mechanical Latch) and a further 30 bellmouths for both the array and export cables, protecting subsea cables at foundation entry/exit points. The equipment was to be manufactured at Tekmar’s facility in North East England under an ongoing framework agreement with Ørsted.