Royal Haskoning DHV conducted an SAC Survey for Hornsea 2 in 2021. The environmental monitoring survey used transects starting 50 m from the edge of the proposed cable protection boundary (at right angles to the cable route), crossing the cable protection area and continuing 50 m beyond the cable protection berm boundary on the opposite side, as part of a monitoring approach intended to identify environmental recovery over time.