Hutchinson Engineering Ltd was contracted by EEW Group to fabricate and carry out on-site assembly of 30 Suspended Internal Platforms (SIPs) for Hornsea Two. The SIPs are secondary steel components installed inside turbine transition pieces as part of the foundation package.