Heerema Marine Contractors installed the two offshore substations at Hornsea Two using the heavy-lift vessel Sleipnir. Heerema installed the jacket foundations for the offshore substation (OSS) and the reactive compensation station (RCS) in October 2020 and later installed the topsides on their jackets.