The Horns Rev 3 export cable is the 220 kV HVAC export connection built to evacuate generation from the Horns Rev 3 offshore wind farm to the Danish onshore transmission network. The system transfers approximately 400–407 MW generated by the 49-turbine Horns Rev 3 array via inter-array cables to an...
Energinet awarded ABB a contract worth $40m (April 2014) for supply and installation of the AC power cable system to integrate/transmit power from Horns Rev 3 — figure likely covers...
1 Cost inflated in local currency then converted to euros (where applicable).
Cable Specifications
Horns Rev 3 export cable (Horns Rev 3 – Endrup)
Houstrup Strand, Varde, Denmark
1 × 220 kV HVAC · 407 MVA · 79 km
System:1 × 220 kV HVAC
Power rating:407 MVA
Route length:79 km(34 subsea · 45 land)
Burial depth:
Subsea section: the export cable was buried in the seabed with a nominal/minimum burial target of about 1.0 m below seabed; post‑installation burial commences beyond the scour protection and the...
Fibre optic:
The Horns Rev 3 export cable system includes integrated fiber optic sensor cables used for distributed temperature sensing (DTS) and distributed acoustic sensing (DAS) for fault location and real‑time temperature/acoustic...
Horns Rev 2 – Horns Rev 3 backup cable
1 × 220 kV MVAC · 420 MVA · 8 km
System:1 × 220 kV MVAC
Power rating:420 MVA
Route length:8 km(8 subsea · 0 land)
Burial depth:
Documented minimum/target burial for Horns Rev 3 subsea cables is approximately 1.0 m below the seabed. Installation reports state a minimum burial depth of 1.0 m was set for all...
Fibre optic:
The Horns Rev 3 power cable system includes loose-tube optical sensor cabling integrated with the power cable. Project documentation describes loose-tube fibre optic cables with 4 x 12 G.652.D single‑mode...