The Horns Rev 2 export cable is the 150 kV HVAC export link that evacuates electricity from the Horns Rev 2 offshore substation (the wind farm transformer platform) to the Danish onshore transmission network. The cable carries the output of the 209 MW Horns Rev 2 wind farm and comprises...
Contract sum DKK 25.5 million for the onshore land cable installation (Blaabjerg to Endrup, ~57 km) by Per Aarsleff A/S — this is the onshore portion of the Horns Rev...
Blåbjerg Klitplantage (Blåbjerg), West Jutland, Denmark
1 × 150 kV HVAC · 95 mm dia. · 230 MVA · 98 km
System:1 × 150 kV HVAC
Construction:95 mm dia.
Power rating:230 MVA
Route length:98 km(42 subsea · 56 land)
Burial depth:
Onshore section: Contractor Per Aarsleff excavated a trench for the 150 kV land cable with an approximate trench depth of 1.5 m (trench width ~0.8 m at the bottom and...
Fibre optic:
Onshore provision: The land works included two casing pipes alongside the three high‑voltage land conductors; one duct contains a fibre‑optic cable used to provide communications between the offshore platform/substation and...