The Hollandse Kust Noord and Hollandse Kust West Alpha export cable systems will consist of two 220kV AC cable systems each. These four cable systems will cover a total length of 210 km, connecting the wind farms to the onshore Dutch power grid near Beverwijk... LS Cable & System is responsible for the design, manufacturing, termination and testing of the submarine power cables, as well as for the land and platform cables.
TenneT awarded LS Cable & System, in consortium with Jan De Nul Group, the contract to design and manufacture the high-voltage cable systems for the Hollandse Kust Noord and Hollandse Kust West Alpha grid connections. For Hollandse Kust West Alpha, LS Cable & System is responsible for the engineering, production, termination and testing of approximately 106 km of 220 kV AC submarine export cables (two parallel circuits over a 53 km route), which connect the HKW Alpha offshore substation to the onshore grid near Beverwijk. The company also supplies associated land and platform cables under the same multi-project contract. Offshore execution, including transport and installation by Jan De Nul, was scheduled for 2022–2023 as part of the construction phase of TenneT’s standardised 700 MW offshore grid connection programme.