By 31 March 2021, the cable routes for TenneT’s offshore grid connections, including the Hollandse Kust (West, site VI) / Hollandse Kust West Alpha connection, had been established. This defined the transmission corridors between the Hollandse Kust West Alpha offshore wind area and the designated onshore connection point at Beverwijk as part of TenneT’s standardised Dutch offshore grid rollout.