Jörss — Blunck — Ordemann GmbH won a contract from EnBW to provide the detailed design of the wind turbine substructures and foundations for the He Dreiht offshore wind farm in Germany. The scope covered the structural design of the monopile foundations, as well as electrical and mechanical design and corrosion protection design, in accordance with BSH regulations.