Heerema Marine Contractors was awarded a contract by EnBW to transport and install the wind turbine foundations at the He Dreiht offshore wind farm in the German North Sea. The executed scope included transport and installation of 64 monopiles and 64 transition pieces in approximately 40 m water depth, with piling and installation performed using the SSCV Thialf and associated noise-mitigation systems.