preemptive repair to one of the four export cables
N-Sea Group was awarded a contract by Gwynt y Môr OFTO to perform a pre-emptive repair to one of the four 132 kV export cables connecting the Gwynt y Môr offshore wind farm to the onshore grid. The scope included offshore repair operations and supporting in-house survey/UXO capabilities to protect export cable integrity and maintain transmission availability.