CT Offshore was awarded the contract for free-laying, installation and burial for 63 cables of the 161 inter-array cables; cable laying vessel Sia, owned by CT Offshore, conducted the array cable laying operation.
CT Offshore carried out inter-array cable installation at Gwynt y Môr using its cable laying vessel Sia, undertaking free-lay, installation and burial works for part of the wind farm’s inter-array cable set (63 of the 161 inter-array cables).