In October 2020, an export cable failure occurred on the Gwynt y Môr OFTO transmission link, causing significant outages and triggering a series of repair campaigns. The fault, associated with fibre‑optic issues within the cable, reduced the availability of the transmission system connecting the 570MW class wind farm to the onshore grid.