In May 2017, GridLink Interconnector Ltd and Réseau de Transport d’Electricité (RTE) signed the technical and financial proposal (PTF) covering the works required to create the French grid connection at Warande, thereby accepting RTE’s grid connection offer for the GridLink interconnector.