Aibel was awarded a FEED Phase 1 contract (as part of an engineering partnership) for the Green Volt floating offshore wind project. The FEED Phase 1 scope included engineering for an offshore substation concept covering both jacket and topsides, supporting the project’s offshore high-voltage infrastructure required to deliver power to offshore oil and gas assets and to the onshore connection.