engineering and installation services associated to inter array cable installation... installation and burial of infield power cables, pull-in and hang off to J-Tubes and pre- and post- site survey
Technocean AS (a subsea construction subsidiary of Reef Subsea AS) signed an integrated contract to provide engineering and installation services for inter-array cable installation inside the Greater Gabbard wind farm. After being given direct responsibility by Fluor, Technocean’s scope covered engineering and project management for installation and burial of infield power cables, pull-in and hang-off to J-tubes, and pre- and post-installation site survey work.