Offshore site preparation for the Great Belt Power Link began in June 2009, when contractor works used the remotely operated vehicle Subtrench Two to pre-trench a narrow, up to 1.15 m deep seabed trench along parts of the Great Belt route to receive the HVDC submarine cables, while minimising environmental disturbance.