Platforms: 1 offshore, 1 onshore Capacity: 750 MW Cable type: HVAC 225 kV Cable length: ~300 km total (subsea + land) Expected COD 2031-2032. Initial developer: EDF/Maple Power (250 MW). Cable: Prysmian (~€350M, part of €700M FA). 25 km off Mediterranean coast. Shared with future AO9 Golfe de Fos 2.
No lifecycle events recorded yet.