Ørsted contracted Boskalis for transport, installation, and burial of inter-array cables (combined total 106 cables for Gode Wind 3 and Borkum Riffgrund 3).
Boskalis was contracted by Ørsted to transport, install, and bury the inter-array cables for the Gode Wind 3 offshore wind farm (awarded jointly with Borkum Riffgrund 3). The scope covered installation and burial of a combined total of 106 inter-array cables across the two Ørsted projects, executed using the cable-laying vessel Boka Ocean, with installation activities scheduled for early 2024.