Jan De Nul Group was contracted by Ørsted Wind Power A/S for the transport and installation of monopile foundations at the Gode Wind 3 offshore wind farm in the German North Sea. Jan De Nul’s scope covered offshore transport and installation of the wind turbine monopiles as well as the offshore substation foundation and associated topside as part of a joint package for Gode Wind 3 and Borkum Riffgrund 3, with installation executed using the next-generation installation vessel Les Alizés.