Cadeler A/S signed a contract with Ørsted to provide transportation and installation services for Siemens Gamesa 11 MW wind turbine generators across Ørsted’s German offshore wind projects, including Gode Wind 3. The work was planned to be executed using Cadeler’s O-class jack-up installation vessel Wind Osprey (upgraded crane). At Gode Wind 3, Wind Osprey was used to install turbines during the 2024 installation campaign.