Balltec supplied connector tools and receptacles to support handling of multiple wind turbine generator components for the Gode Wind 3 offshore wind farm during the offshore construction campaign. Balltec was contracted by Jan De Nul Group, which was responsible for transport and installation of the monopile foundations and offshore substation topside on the project.