Contract for the delivery and installation of 140 km of 34 kV inter-array cables for Gode Wind 1 and 2.
Nexans was contracted by DONG Energy to deliver and install 140 km of 34 kV inter-array cables for the Gode Wind 1 and Gode Wind 2 offshore wind farms in Germany. The medium-voltage inter-array cable system linked the turbines and connected the strings to an offshore transformer platform.